1. Disconnect the battery from weight. |
2. On the cold engine merge 3–4 l of a liquid. |
3. On 6-cylinder engines remove soaking up collector (subsection 3.2.5 see.). |
|
4. Disconnect a socket and remove the gauge. On 6-cylinder engines the detonation gauge is mounted under a soaking up collector. |
5. The new gauge tighten with the moment 36 Н.м. (Hermetic is put on a carving of the new gauge by the manufacturer). |