Toyota Camry

1996-2001 of release

Repair and car operation



Toyota Camry
+ 1. The maintenance instruction
+ 1.2. The information before car driving
+ 1.3. Independent maintenance service
+ 1.4. Technical characteristics
+ 1.5. Some councils at car purchase
+ 2. Maintenance service
+ 3. Engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
- 7. An exhaust system
   - 7.2. Systems of decrease in toxicity of the fulfilled gases
      7.2.2. Technical characteristics
      7.2.3. OBD II-system
      7.2.4. II-system computer OBD (Powertrain Control Module)
      7.2.5. The gauge of turn throttle заслонки
      7.2.6. The gauge of absolute pressure in a soaking up collector
      7.2.7. The gauge of the mass expense of air
      7.2.8. The gauge of temperature of soaked up air (IAT-gauge)
      7.2.9. The gauge of temperature of a cooling liquid (ECT-gauge)
      7.2.10. The rotation gauge коленвала
      7.2.11. The gauge of rotation of a cam-shaft
      7.2.12. The contact gauge of pressure of the hydraulic booster
      7.2.13. The gauge of the maintenance of oxygen in the fulfilled gases
      7.2.14. The detonation gauge
      7.2.15. The gauge of speed of the car
      7.2.16. Перепускной the air valve of idling (IAC-valve)
      7.2.17. System of a choice of the channel всасывания (ACIS-system)
      7.2.18. Ventilation system картера
      7.2.19. System recycling
      7.2.20. System of catching of steams of gasoline
      7.2.21. Neutralizer
      7.2.22. Three in one – or how to save the catalyst
+ 8. Transmission
+ 9. A running gear
+ 10. Brake system
+ 11. A body
+ 12. An electric equipment


75acfaa4

7.2.14. The detonation gauge
THE GENERAL DATA

The detonation gauge is intended for detonation registration in cylinders and reduction of a corner of an advancing of ignition. On 4-cylinder engines the gauge will screw in the block of cylinders under a head, on 6-cylinder engines 2 gauges which will screw under a soaking up collector are provided.

Check

PERFORMANCE ORDER
1. The chain between a conclusion of the gauge and its case should not be closed накоротко. Otherwise the gauge replace.

Replacement

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. On the cold engine merge 3–4 l of a liquid.
3. On 6-cylinder engines remove soaking up collector (subsection 3.2.5 see.).
4. Disconnect a socket and remove the gauge. On 6-cylinder engines the detonation gauge is mounted under a soaking up collector.
5. The new gauge tighten with the moment 36 Н.м. (Hermetic is put on a carving of the new gauge by the manufacturer).