Toyota Camry

1996-2001 of release

Repair and car operation



Toyota Camry
+ 1. The maintenance instruction
+ 1.2. The information before car driving
+ 1.3. Independent maintenance service
+ 1.4. Technical characteristics
+ 1.5. Some councils at car purchase
+ 2. Maintenance service
- 3. Engines
   - 3.1.2. Compression check
      3.1.3. The top dead point (ВМТ) piston N1
      3.1.4. A cover of a head of cylinders
      3.1.5. An inlet collector
      3.1.6. A final collector
      3.1.7. A gazoraspredelitelnyj belt and asterisks
      3.1.8. A forward epiploon of a cranked shaft
      3.1.9. A camshaft epiploon
      3.1.10. Camshafts and lifts of valves
      3.1.11. A head of cylinders
      3.1.12. The oil pallet
      3.1.13. The oil pump
      3.1.14. The Flywheel / a leading disk
      3.1.15. A back epiploon of a cranked shaft
      3.1.16. Engine fastenings
   + 3.2. 6-cylinder двухрядные engines V6 of 3,0 l
   + 3.3. A partition of engines
   + 3.4. An engine electric equipment
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Transmission
+ 9. A running gear
+ 10. Brake system
+ 11. A body
+ 12. An electric equipment


75acfaa4

3.1.11. A head of cylinders
THE GENERAL DATA

Head of cylinders of the engine 5S-FE

1. The system valve recycling
Exhaust gases and the vacuum converter
2. A lining
3. A lining
4. A throttle
5. Демпфер pulsations in fuel system
6. A fuel hose
7. A lining
8. An inlet collector
9. A hose of return of fuel
10. A tube of giving of fuel
11. A sealing ring
11а Izoljatsionnaja the plug
12. An injector
13. An insulator
14. The plug
15. The valve
16. A cover of a head of cylinders
17. A clamp
18. An adjusting lining
19. The isolating plug
20. An epiploon
21. The valve
22. A spark plug
23. The valve lift
24. Clamps
25. A spring plate
26. A valve spring
27. A spring saddle
28. A lock ring
29. The directing plug of the valve
30. A camshaft of final valves
31. A hook for an engine raising
32. A branch pipe of system of cooling
33. Prorolling
34. The gauge of pressure of oil
35. A perepusknaja tube of system of cooling
36. A teploizolirujushchy guard of an oil radiator
37. A teploizolirujushchy guard of a final collector
38. Кронштей a final collector
39. Кронштей a final collector
40. A final collector
41. A lining
42. A sealing ring
43. A lining
44. A head of cylinders
45. A hook for an engine raising
46. Grounding contact
47. A generator arm
48. A lining of a head of cylinders
49. A cover газораспределительного a belt
50. A spring of a gear wheel of a camshaft
51. A lock ring
52. A washer
53. An epiploon
54. An additional gear wheel of a camshaft
55. A camshaft of inlet valves
56. A cover of the first bearing of a shaft
57. A lining
58. Fastenings of an inlet collector
59. An air tube
60. A lining
61. A vacuum tube
62. The vacuum valve of system recycling

Removal

Sequence of a tightening of bolts of a head of cylinders


PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.
2. Merge cooling liquid from картера the engine and from a radiator.
3. Merge engine oil and remove the oil filter.
4. Remove a throttle, fuel injectors and a fuel highway.
5. Remove an inlet collector.
6. Remove a final collector.
7. Remove газораспределительный a belt, an asterisk of a camshaft and the top intermediate pulley.
8. Remove the top section of a back cover газораспределительного a belt.
9. Remove camshafts and lifts of valves.
10. Remove the generator and the ignition distributor.
11. Unscrew bolts of the pump of the amplifier of a steering. Shift the pump aside, without disconnecting from it hoses.
12. Disconnect all wires, tubes, hoses and the ropes fixed on a head of cylinders.
13. Loosen the also unscrew head bolts in sequence of return that which is specified in drawing Sequence of a tightening of bolts of a head of cylinders. Weaken bolts on a turn quarter at one time.

14. Remove a head of cylinders.

Installation

PERFORMANCE ORDER
1. Carefully clean and wipe acetone joined surfaces of a head and the block of cylinders. If surfaces are scratched or damaged otherwise they are necessary for processing in a specialised workshop.
2. By means of a suitable tap clean carvings in the block of cylinders. By means of a suitable die clean bolts of a head of cylinders.
3. Establish a new lining of a head and establish a head.
4. Grease bolts with pure engine oil.
5. Insert bolts and tighten them till the demanded moment of an inhaling in sequence specified on drawing Sequence of a tightening of bolts of a head of cylinders.
6. Establish the remained details.